B+W is delighted to have completed our scope of works on the stunning new leisure centre located in Stratford, London. Consisting of a main pool (25m x 13m) and multi-activity pool (20m x 10m) with a moving floor. B+W was also responsible for the design, supply, installation and commissioning of the associated filtration and water treatment plant.
Each pool has its own dedicated water treatment and filtration system based on medium rate sand filtration with chlorine disinfection, pH correction and UV sterilisation. Steel filter vessels to B+W’s own design with a hypalon rubber lining have been utilised for durability.
This is B+W’s first project with Mulalley and Company Ltd and was designed to Van Zyl & De Villier Consulting Engineers specification.