Our Global Portfolio
Filter
Barr + Wray were appointed by BRIMS Construction to undertake the supply and installation of the filtration and water treatment systems for both the indoor pool and outdoor vitality pool, including the associated hydrotherapy massage features.
Barr + Wray were appointed by Heron Bros to supply and install the filtration and water treatment systems for the 25m and learner pools, together with a Variopool movable floor.
Barr + Wray were appointed by Galliford Try to supply and install the outdoor stainless steel pool and filtration and water treatment system at the Ferry Lane residential development.
Barr + Wray were appointed by Morrison Construction to supply and install the Myrtha hydrotherapy and learner pools at Lockhart ASN School, including the associated filtration and water treatment systems.
Barr + Wray were appointed by Mace Construction to supply and install the 25m and learner pools, complete with advanced filtration and water treatment systems.
Barr + Wray were appointed by Mivan to supply and install the lap pool structure and finishes, together with the associated filtration and water treatment system and thermal cabins.
Barr + Wray were appointed by Beck Interiors to supply and install the lap pool and vitality pool shells and finishes, together with the associated filtration and water treatment systems.
Barr + Wray were appointed by Hobson Porter to undertake the refurbishment works at Hornsea Leisure Centre, including the complete replacement of the pool plant equipment.
Barr + Wray were appointed by Kier Construction to supply and install the Myrtha pools with Ceramic Micro Filtration systems and thermal cabins at Neath Leisure Centre.